Progress photos from 2016-07-08
- Poolside covered deck of unit 1
- Looking into unit 1dining room from pool / patio area
- Ready to pour the stairs. I wasn't on site the morning the stair rebar was tied but I'm pretty sure an 8"x8" grid of 5/8 rebar is strong enough to drive a D8 Cat up onto the second floor.
- Dining room looking to pool area from unit 2
- Cutting down ceiling blocks to fit
- Our plumber/ electrician hard at work.
- Pre-installing plumbing and electrical
- Looking towards the front unit from the second floor of the back units
- Looking from top floor of unit 3
- Looking from top floor of unit 3
- Looking from top floor of unit 3
- From the road.
- From the road